Tuesday, 30 September 2014
Annual minimum flow
The annual minimum flow to date occurred on 24 September after a dry period of 5 days. Stage dropped to about 31 cm which is approximately 0.4 m3/s (0.0206 m3/s/km2) on the current stage-rating curve. A rainfall event of 37 mm around 25 September was enough to raise the baseflow level of the river by about 4 cm. This year's precipitation has been more evenly distributed than average which means that the annual minimum flow is also relatively high.
Friday, 19 September 2014
September low flows
The first 9 days of September were very dry (just 3 mm of rainfall on the 5th), and we can see the water level falling to only about 32 cm. This might be the lowest water level for the water year, also known as the minimum annual flow. Today we measured the discharge to be 0.45 m3/s at a stage of 34.5 cm. With a basin area of 19.45 km2, the specific discharge becomes 0.0231 m3/s/km2.
Monday, 1 September 2014
August rain
The hydrograph above shows that rains were quite frequent during August this year. Total precipitation for the month was 224mm at Miomote Amedas station, which is slightly above the average value of 209mm. The most notable storm event occurred on 11 August with a daily precipitation of 68mm (maximum intensity 15mm/h). Hot and dry weather around the week of 25 August saw the river level drop to near season-lows, and the daily fluctuations appear to show the influence of strong evapotranspiration during daytime. However, the dry first week of August does not show this diurnal pattern.
Friday, 1 August 2014
End of rainy season
The flood that we witnessed on July 9th turned out to be the largest flood of the rainy season this year. The hydrograph above shows that flood stage reached about 1m on the first peak, but then surged up to nearly 1.6m on the evening of July 9th. On that day 114mm (max. 20.5mm/h) of rain fell at Miomote, while 171mm (max. 26.5mm/h) fell at Takane Amedas station. The flood peak is very sharp and short-lived, with flood stage only remaining above 1m for about 3 hours.
Today we visited the field in typical mid-summer hot and humid conditions, and we took the opportunity to replace the base for the rain gauge located in the tributary basin. We encountered problems with rusty bolts for the rain gauge in the paddy field location and had to bring this one back to the lab for fixing. Trees are starting to encroach on both locations and are likely already having an influence on reducing the precipitation catch compared to a true open site.
Wednesday, 9 July 2014
Rainy season arrives
| Stage = 85cm |
We arrived at 10am and set about making a discharge measurement using the float method. The flow was too high to try the wading method with current meter. Using a distance along the bank of 25m, we used branches as floats to measure surface velocity with a stop watch. We used six points across the width of the channel from the bridge. We estimated the mean surface velocity was about 1.5m/s, giving a mean profile velocity of about 1.2m/s (multiply by 0.8). Multiply this by mean depth (0.63m, estimated from current stage and the most recent channel cross-section), and channel width (11.6m), gives total discharge of about 8.75m3/s. Although this estimate is very approximate, it does fit within the bounds of the current stage-rating curve.
Wednesday, 25 June 2014
Waiting for the rain
| Stage = 33.25cm, Discharge = 0.374 m3/s |
Depending on the arrival of the rainy season downpours, mid to late June can have the lowest discharge levels of the year for Takiya River. The snowmelt season has ended, and conditions can be extremely dry and hot. Levels of ET (evapotranspiration) rise and this reduces groundwater levels and the amount of flow in the river. The hydrograph below shows some rain fell on 13-14 June (45mm), but it is not enough to prevent the continuing fall of river discharge towards annual minimum levels.
Friday, 6 June 2014
A walk in the river
| Discharge measurement in the tributary, Takiya 2 (basin area approx. 1km2) |
A walk in the river can teach you many things. Today we walked the several hundred metres from the gauging point on Takiya River to the point where irrigation water is taken, close to the confluence with the Miomote River. Along the way we walked in the flowing water through riffles and pools, observing the changing channel form and channel bed materials, and the ecological environment.
| Gauging point on Takiya River |
| Right bank with staff gauge and pressure transducer inside the steel pipe |
| Left bank with stable bedrock and moss |
| Dozens of small frogs were spotted in the river |
| Huge keyaki tree interrupts the plantation cedars |
| Channel becomes wide and shallow upstream of the irrigation diversion dam |
| Irrigation diversion dam made from gabions - wire crates filled with local rock material |
| Irrigation canal headworks gate |
| Settling pond for sediment below the headgate |
| Pure mountain water flows off towards the paddy fields |
Subscribe to:
Posts (Atom)




