Thursday, 17 October 2024

Regular fieldwork

 Much flood debris had accumulated around the gauging cross-section, which we had to remove by hand. Over two years have passed since the record flood of August 2022, but the channel is still very unstable and heavily aggraded. The left-hand bank upstream of the bridge has been engineered with concrete to protect the forest access road located above it. Partly as a result of this activity, the right-hand bank is looking very prone to erosion with the danger of large cedar trees falling into the river. 








No comments:

Post a Comment

Note: only a member of this blog may post a comment.